Solar · EPC · Storage · Technology
0264 241 43 27İFAS Partner ↗
İFAS ENERJİ · Solar Project Development

Move a solar project from an idea to a decision-ready brief.

A stage-by-stage way to reduce missing information before engineering and procurement commitments.

Discuss your project ↗
01

Separate the development stages

An initial opportunity, a surveyed site and a project ready for construction have different evidence requirements. Record the current stage and the decision being requested. A developer seeking an early budget needs a different deliverable from an owner asking a contractor to commit to a construction programme.

02

Maintain an evidence register

List site control, consumption records, drawings, surveys, connection information and commercial assumptions. Mark each item as verified, pending or assumed, with a responsible person and a review date. This makes uncertainty visible and helps prevent a preliminary assumption from silently becoming a contract requirement.

03

Use decision gates

Agree what must be known before moving to the next stage: site suitability, connection approach, engineering scope, equipment strategy and commercial basis. Document unresolved dependencies. A programme should distinguish tasks controlled by the project team from decisions that depend on authorities, landlords, utilities or other parties.

04

Prepare the next engagement

For an engineering or EPC enquiry, provide the evidence register with the requested deliverables and target schedule. Ask bidders to identify missing information and scope assumptions in their response. Country-specific approvals and eligibility need current local review; this guide does not establish a project’s regulatory status.

START WITH YOUR REQUIREMENTS

Let’s define the next step.

Share your site, consumption and project schedule.

Start a project ↗